Northland Tool & Electronics is proud to be able to provide spindle repair and spindle rebuilding services across the United States and beyond. Thanks to our blog, we are able to show you images and share stories about spindle repairs such as this Weiss Bridgeport Spindle Repair which came from Knoxville, TN. Or this Mori Seiki CL203B Spindle Repair that came from Chicago, IL.
Matsuura MAM700 Spindle Repair
Matsuura
MAM700
15,000 rpm
A spindle failing during a customer’s busy time is not good thing. Our customer called and needed this spindle repair done as soon as possible. We received the spindle and found that the shaft nose OD rubbed out on the front cover. The shaft taper had 18 microns of run out and the front bearings were contaminated. The spindle would need grind, chrome plate and finish grind to the taper, a kiss grind to the OD nose and front cover. We expedited the shaft rework through our Kellenberger grinding department. The shaft was then hand carried to the platers and picked up the following day. The shaft was put on the Kellenberger grinder the same day that it was picked up. Our spindle repair technician replaced the drawbar, springs, grippers, bearings and orings. The taper now has only 1 micron of run out. All out going test show that the spindle had good balance and drawbar force. The customer received their spindle repair back within 4 days.
Kitamura Mycenter 2X Spindle Repair
Kitamura
Mycenter 2X
10,000 rpm
This customer called and needed a spindle repair done within 5 days. We received the spindle and expedited the breakdown process. The rear roller bearing cage had failed causing the rolling elements to collide causing the spindle seizure. The Belleville washers for the drawbar were damaged and the taper was worn. The spindle repair was evaluated, quoted and approved within 24 hours. The shaft was kiss ground in our grinding department that specializes in spindle repair applications the same day the spindle was approved. Then the spindle went to our assembly area where the technician replaced the bearings and bellevilles. The technician adjusted preload, assembled and ran the spindle. Our quality control department inspected the spindle. The spindle repair was approved by the QC inspection process. The customer was very happy with our quick turn service and how we expedited everything through our facility.
Mazak
CNC-9
4,000 rpm
Due to economic times this customer was going to rebuild this Mazak CNC-9 spindle themselves. They disassembled the spindle and found that when the spindle seized up the bearings spun on the shaft causing damage. They decided to send the spindle in because they were not equipped to repair the shaft. The shaft is a very critical part of the spindle and if it is out of tolerance putting new bearings back on the shaft will not make the spindle life last any longer. Each part must be at or within the ISO tolerances allowed. This customer made the smart choice and is now up and running with a spindle that is at OEM specifications.
GMN TSSV120-60000-5 Spindle Repair
This spindle came to us and was needed back at the customers ASAP. We disassembled and inspected the spindle. All critical spindle components passed quality control inspections except the taper that had 4 microns of run out. Additionally, when we checked the customers tooling we found that it had 30 microns of run out. We contacted the customer and it was determined that the tooling would need a kiss grind.
We kiss ground the tooling, adjusted preload and balanced the spindle. Final quality control showed that the tooling taper now had 3 microns of run out, well within the acceptable range of our customer’s tolerances. The customer had his spindle back within 3 business days. We were able to perform such a quick turn around because we currently employee two certified technicians to run our precision Kellenberger grinders.
Written by Sandy Smith
Matsuura R plus 800 Spindle Repair
12,000 rpm
The rear roller bearing failed in this spindle. The tooling taper had 9 microns of run out and needed to be reworked.
This machine was an intricate part of our customers production process and they could not have the machine down for to long. We worked with them to make sure we had the bearings needed for the repair in stock when the spindle arrived. We were able to rework the taper in our grinding department the day the spindle was approved. In fact the spindle was in our clean room being assembled before the end of the approval day. The next day the repair was completed, test run and passed our strict final QC by noon. The spindle shipped that day and our customer was up and running within two days of removing the spindle.
Mazak QT6 Rush Spindle Repair
7,000 rpm
We received this spindle from our customer late morning on Wednesday. It was broken down and evaluated by mid afternoon on Wednesday. We spoke to our customer about the repair, what was needed and the options they had. The spindle was approved late Wednesday.
By Thursday morning the spindle had been completely cleaned and ready for assembly in our clean room. By late Thursday afternoon the spindle was assembled and running on one of our test stands.
Our customer picked up the spindle early Friday morning and their Mazak machine was making parts by days end.
This was the first spindle we had done for this customer and the repair was treated with the urgency required for the situation. If you are in need of fast turnaround times on a spindle rebuild please call one of our staff to discuss the repair. We will always do everything possible to get you up and running.